Eltawila Island
Project information
- Location: Hurghada
- Contractor: Hurghada
- Consultant: ECG
- Client: Al-Masa
- Scope of Work: Curtain walls Doors & windows Louvers
- System: Schüco - Alumil - SH
Eltawila Island
Challenge 1: Using three different systems in the project in order to achieve the optimum cost control. Maintaining the needed performance in all components of the project
Challenge 2: As the project is located on an island in the Red Sea, transportation was not ordinary; speed boats were used for both materials and workers transportation. The trip would take up to 3 hours. Materials trip to the site was quite unusual, as they were double loaded from the factory to the port arriving to the island using speed boats.
Challenge 3: Aluminum fins were originally wood, but OMSI was able to offer a good deal by turning them into aluminum free stand, which is an option with lower price, more durability and maintained the aesthetics of the design.
Challenge 4: Sliding units operable panels formed 2/3 of the whole opening width, while opening dimensions reached almost (9W * 3H) meters, which was a challenge in realizing this design proposal from OMSI's side.