Adly Mansour Transportation Hub
Project information
- Location: Gesr Al Suez – Cairo
- Contractor: JV (Orascom-Arab Contractors)
- Consultant: Moharam-Bakhoum- Archi Plan
- Client: Ministry of Transportation
- Area: Skylight ≈ 24,500 - Dome ≈ 1670
- Scope of Work: Skylight ≈ 24,500 Dome ≈ 1670
- System: Schüco.
Adly Mansour Transportation Hub
Challenge 1: Adly Mansour skylight's area is almost 6 acres which makes it the first one of a kind in the middle east. Such a mega project put OMSI in a different level and earned it the trust towards future projects.
Challenge 2: Deflection and turning of steel members, due to inaccurate load calculations formed a huge challenge during installation. Adding extra stiffeners and tie rods to compensate the flaw in loads' study and to become the base of installing aluminum work.
Challenge 3: Working in extremely great heights which demanded high level of safety work: Two safety nets were provided to protect both workers. Safety ropes to hold workers.
Challenge 4: Sky light leveling. With the vast skylight area, leveling represented a challenge. Scaffolding was considerably costly and time consuming. Also, steel works were delayed as the main frame was not ready and project deadline remained unchanged which extended the working hours to almost 20 hrs./day , with total working hours of 205,910 hrs over the period of the whole project.
Challenge 5: Glass sizes formed a challenge as they were not available which made OMSI choose GGI to supply the glass from Dubai. Adding to that, glass was carried using special tools during installation.
Challenge 6: An additional scope to the skylight with almost 1700 sqm, with a very tight schedule in parallel to skylight work with the same handing-over deadline.